Community: Malden
Number of units: 5
-
- 3 two-bedroom units
- 2 three-bedroom units
Status: Exterior building finishes
Completed: November 2025
Notable design features:
-
- Open floor plan / open dining area
- Eco-friendly building materials
- Drive-under garages
- Private porches / outdoor living spaces
- In-unit laundry
- Walk-in closets
About this project
The Malden II project includes five affordable homes and is next door to our Malden I project, which was completed in 2022.
Habitat Greater Boston broke ground on Malden II in spring 2022, and was completed in November 2025.
The townhome units each have three stories with a garage and storage space on the ground floor, living space and kitchen on the second floor, and bedrooms located on the third floor. These new homes are equipped with energy saving features.
434 Massachusetts Avenue, Suite 201 Boston, MA 02118 617-423-2223


